Construction Remodel Checklist

If you have removed tile or any other material from the wall and there is caulk, glue or dirt you are responsible for cleaning it before we arrive to install. 

Drains are required to be in place prior to the installation date. They must be level and secured to the sub floor. A round 3-part drain is required for a cultured marble/granite floor. If using the old drain please make sure that the bolts are intact by unbolting the drain. The bolts need to be removed in order to install the new shower pan. Old bolts often break during removal. There is a $100 minimum fee for replacing a drain. We have limited plumbing ability. If in doubt, replace the $25 drain especially if there is any rust. 

The moisture resistant sheetrock walls must be solid. We cannot install over damaged/cracking wall board.​

If you have a preference, please mark the walls where you want the shelves installed.

Things to Remember

There may be shade variations between the samples and the finished product. 

We install the panels to ensure that the caulk seams are minimal. Large panels may need to be split if there are space limitations. The installer will determine whether or not a seam is required. 

Large panels or countertops installed between walls may cause minor wall damage. This is most often limited to some scraping of the paint. We are not responsible for minor paint touch ups 

Screws are often required on ceilings that are more than 4 feet wide/long. We will install screw covers as necessary.

Mark the walls indicating where you want shelves.​

Terms and Conditions of Service

Payment of the deposit is construed as acceptance of the terms and conditions below. 

A deposit of 50% of the contract amount is required prior to reserving an installation date and/or manufacture of material. All deposits are non-refundable. The contract balance is due on completion. Upon completion, the credit card (as applicable) used for the deposit will automatically be processed for the unpaid balance unless otherwise agreed to by both parties prior to installation. Final payments are due on the same day the work is completed. Checks or cash can be given to the installer. There is a $25 minimum late fee for payments not received on the due date. In addition, the contractor shall be entitled to 18% annual interest after the payment deadline, and is entitled to attorney fees and/or collection expenses to collect any unpaid balances.

 

Create your dream bathroom.
Tell us about your project today.

Get A Free Estimate